Cross Flow Cooling Towers Rebuild, Eastern Canada

Rebuild Four Packaged Steel Double Flow Cross Flow Cooling Towers at Industrial Manufacturing Facility, Eastern Canada

The original hung Fill Media on all four cells was badly damaged from ice accumulation over years of operation, the cold & hot water basins were rusted.

The fill media was removed; the basins were mechanically cleaned and coated with a fast dry two part epoxy. New High Efficiency Brentwood XF75 Fill media was installed along with separate High Efficiency Brentwood XF80MAx drift eliminators was installed along with new orifice nozzles. This project was completed in two phases to ensure production was not interrupted.

installation-of-bottom-supported-Fill-media-and-separated-drift-eliminators-Eastern-Canada

Installation of bottom supported Fill media and separated drift eliminators.