The fan shaft on this Cooling Tower failed during the height of summer at a downtown Condo facility resulting in the unscheduled shutdown of the central air-conditioning system for the entire building.
We replaced the entire mechanical section within 24 hours including a new fan shaft, fan wheels and bearings, all stock items in our warehouse. The 12’ long fan shaft was carried up 20 flights of stairs because it did not fit in the elevator.